Daily visual and functional inspection for AC Level 2 and DC fast EV chargers in fleet depots, dealerships, and public charging hubs.
Examine the full cable length for cuts, crush marks, or exposed inner shielding, and inspect CCS/J1772/NACS pins for arc pitting, bent contacts, or moisture.
Check cabinet doors and seals for water ingress, confirm cooling fan vents are clear, and ensure the red Emergency Stop button is unobstructed.
Confirm the charger HMI screen shows ready status with no ground-fault trips, and verify cable management retractors keep cords off wet pavement.
Verify protective crash bollards are intact and confirm a Class C/ABC fire extinguisher is accessible near the charging row.
Immediately trip the upstream breaker or press the E-stop, lock out the charger, and have a certified EV technician replace the cable assembly—carbonized pins cause thermal runaway.
Cables left lying on the ground are frequently run over by heavy fleet vans, crushing internal pilot wires and damaging liquid-cooled DC conductors.
Comprehensive daily DVIR pre-trip inspection for commercial trucks, buses, and goods carriers covering engine bay, air brakes, suspension, and compliance documents.
Daily pre-use safety inspection for 2-post automotive service lifts covering arm restraints, mechanical safety latches, rubber pads, and hydraulic lines.
Daily pre-spray inspection of downdraft/crossdraft automotive paint booths covering manometer pressure, exhaust filters, interlocks, and fire suppression.