Pre-dispatch verification of outbound freight count, pallet stability, hazardous placards, bill of lading accuracy, and tamper-evident container seals.
Verify pallet count, SKU batch numbers, and total weight against theWMS dispatch order and signed Bill of Lading (BOL).
Confirm pallets are shrink-wrapped to the pallet base, heavy freight is loaded low and forward, and load bars or straps prevent shifting.
Ensure dangerous goods declarations match interior cargo and required DOT/ADR placards are affixed on all four sides of the vehicle.
Lock the trailer doors, thread a numbered bolt or cable seal through the primary hasp, tug to confirm engagement, and record the seal number on the BOL.
A timestamped photo of the locked, tug-tested seal provides indisputable chain-of-custody proof for C-TPAT and ISO 28000 audits in case of transit tampering claims.
Pulling firmly on the bolt seal after snapping it into the barrel confirms the internal locking ring engaged properly and the seal was not pre-compromised.
Mandatory pre-shift visual and operational inspection for counterbalance and electric forklifts before entering warehouse aisles.
Daily safety and mechanical check for loading dock bays, hydraulic dock levelers, trailer restraints, and dock plates before freight transfer.
Daily temperature, humidity, and door-seal verification log for refrigerated warehouses, blast chillers, and outbound reefer trailers.