Pre-pour safety inspection for boom/line concrete pumps and ready-mix trucks covering outrigger cribbing, boom pipe thickness, hopper grates, and power-line clearance.
Verify the concrete pump is parked on firm, level ground away from trenches/vaults. Extend outriggers fully onto engineered cribbing pads sized for maximum leg load.
Confirm boom swing envelope maintains at least 20 feet (or OSHA Table A distance) from all overhead power lines and assign a dedicated spotter if working near energized lines.
Verify the concrete hopper grate is closed and its interlock stops the agitator when lifted. Check all Victaulic/pipeline couplings for safety pins and whip-check cables at rubber hose connections.
Ensure the hose crew wears eye protection, long sleeves, and rubber boots (alkali burn prevention), and verify clear hand/radio signals with the pump operator before priming.
Blockages create extreme hydraulic pressure in the delivery line; a sudden release or kinked rubber end-hose can whip violently and cause severe blunt-force trauma.
Wet Portland cement is highly alkaline (pH 12–13) and causes severe chemical burns. Workers need waterproof rubber boots, alkali-resistant gloves, long pants/sleeves, and eye protection.
Competent-person daily inspection for supported and tubular frame scaffolding covering mudsills, plumbness, full decking, guardrails, and scaffold tag status.
Pre-shift 360-degree walkaround and cab function check for hydraulic excavators covering undercarriage, boom/bucket pins, hydraulic leaks, and swing alarms.
Mandatory daily pre-operation inspection for tower cranes covering anemometer wind speed, load moment indicator (LMI), anti-two-block, hoist ropes, and slewing brakes.