Daily pre-start mechanical, fluid, and battery readiness checklist for standby commercial diesel generators (DG sets).
Confirm the AMF/controller is in AUTO (unless testing manually), E-stop is unlatched, and the canopy area is clear of flammable debris.
Pull the dipstick to verify lube oil is between Min and Max marks and inspect the radiator sight glass or overflow tank for adequate coolant.
Check diesel level in the day tank, drain any water from the fuel-water separator, and inspect hoses and under-skid drip trays for leaks.
Verify cranking battery float voltage (typically 13.2–13.8V for 12V or 26.4–27.6V for 24V), clean terminals, and confirm jacket water heater warmth.
Inspect the air restriction indicator, fan belts for tension/fraying, and confirm the exhaust rain flap and ventilation louvers are unobstructed.
Over 80% of standby generator start failures stem from dead cranking batteries, low coolant, or tripped breakers—issues caught only by daily physical checks.
NFPA 110 and facility best practices typically require maintaining at least 75% capacity in the day tank or enough fuel for 8–24 hours of continuous rated load.
Monthly statutory inspection SOP and QR checklist for portable ABC, CO2, and foam fire extinguishers across commercial buildings.
Weekly preventive maintenance SOP for water-cooled/air-cooled chillers, chilled water pumps, and air handling units (AHUs).
Daily operational safety walkthrough for passenger elevators covering door interlocks, leveling accuracy, emergency intercoms, and lighting.