Daily pre-shift safety check for hydraulic stamping, forming, and arbor presses verifying light curtains, two-hand anti-tie-down controls, hoses, and die clamping.
Break the light curtain beam with the calibrated test rod at top, middle, and bottom zones to verify immediate ram stop. Confirm both palm buttons must be pressed within 0.5 seconds to cycle.
Check high-pressure hoses for abrasion, blistering, or weeping fittings, verify cylinder rod wipers are clean, and confirm hydraulic reservoir level and temperature are within spec.
Inspect upper and lower die T-bolts/clamps for tightness, check guide-post lubrication, and verify no tools, shims, or scrap slugs remain in the die area.
Cycle the press unloaded, verify system pressure matches the job setup sheet, and confirm the ram holds position at top-dead-center without downward drift.
Use the manufacturer-supplied opaque test rod (sized to the curtain's resolution) and pass it through the top, center, and bottom of the sensing field while the ram is moving or armed; the press must fault/stop immediately.
Anti-tie-down circuitry prevents an operator from taping or wedging one palm button down and cycling the press with one hand, which would leave the other hand exposed to the closing die.
Standardized pre-shift inspection for CNC machining centers covering coolant levels, way lube, spindle warm-up, and interlock guarding before cutting metal.
Daily safety and water-chemistry verification for industrial steam and hot-water boilers covering low-water cutoffs, relief valves, and burner flame stability.
Step-by-step hazardous energy control checklist ensuring electrical, pneumatic, hydraulic, gravitational, and thermal energy sources are isolated and zero-verified before servicing.