Monthly physical and earth-resistance verification SOP for plant earthing pits, lightning down-conductors, and equipotential bonding.
Open the earthing pit cover, remove debris, and inspect the copper/GI earth strip and bimetallic clamp bolts for looseness or green/white corrosion.
Use a calibrated clamp-on earth tester or 3-pole fall-of-potential meter (with test link isolated if required) and log the resistance in ohms.
If resistance climbs above target (typically <1–2 ohms for substations/IT, <5 ohms general), pour clean water into the watering funnel to restore soil conductivity.
Ensure the pit ID plate is legible, re-tighten test link bolts securely, and seat the pit cover flush with grade.
While general building earthing often targets under 5 ohms, substations, data centers, and lightning protection grids typically require under 1 to 2 ohms.
Excessive rock salt corrodes copper and galvanized electrodes rapidly; use bentonite or conductive carbon-based backfill compounds instead.
Weekly performance, thermal, and DC string health inspection for commercial/utility-scale solar PV inverters and combiner boxes.
Daily external inspection SOP for oil-immersed distribution and power transformers covering MOG oil level, OTI/WTI temperatures, and silica gel breather.
Daily perimeter, switchyard, and control-room safety walkthrough for industrial and utility electrical substations.