Weekly readiness and pre-use dielectric inspection for arc-flash suits, face shields, and Class 00–4 insulating rubber gloves.
Roll each insulating rubber glove cuff to trap air, listen and feel for pinhole leaks, and inspect for ozone cracking, embedded metal, or swelling.
Verify the stamped lab dielectric test date is within the mandatory 6-month window and inspect leather over-gloves for oil stains or holes.
Check the cal/cm² rating label, inspect the tinted arc-shield visor for deep scratches or cracks, and confirm hood seams and Velcro closures are intact.
Inspect 1000V insulated tools and hot-sticks for nicked insulation and ensure gloves are stored flat in protective canvas bags away from UV/heat.
OSHA 1910.137 and ASTM F496 require dielectric re-testing every 6 months once issued for service, plus a field air-inflation check before every use.
No, unless specifically exempted for tight dexterity work under strict rules; leather protectors shield the rubber from mechanical punctures and arc-flash heat.
Weekly performance, thermal, and DC string health inspection for commercial/utility-scale solar PV inverters and combiner boxes.
Daily external inspection SOP for oil-immersed distribution and power transformers covering MOG oil level, OTI/WTI temperatures, and silica gel breather.
Daily perimeter, switchyard, and control-room safety walkthrough for industrial and utility electrical substations.