Daily electrical room walkthrough for 415V/480V Main LT Power Distribution Boards (PDB/MCC) checking meters, APFC power factor, and panel temperature.
Record L1/L2/L3 phase voltages, ampere load, and power factor (target ≥0.98) from the main incomer multifunction meter, checking for phase imbalance.
Verify Air Circuit Breaker (ACB) spring-charge status and inspect the APFC panel for tripped capacitor stages or swollen capacitor cans.
Scan busbar chamber doors with an IR gun for hot spots, feel enclosure doors cautiously with the back of a gloved hand, and sniff for ozone/burning insulation.
Ensure all panel doors are latched, cable gland plates are sealed against rodents, and 1.1m OSHA working clearance is free of storage.
Swollen or shorted power-factor capacitors can rupture violently and cause utility power-factor penalties if left offline.
NFPA 70 (NEC 110.26) requires at least 3 to 4 feet (0.9–1.2m) of unobstructed working space, and electrical rooms must never be used for storage.
Weekly performance, thermal, and DC string health inspection for commercial/utility-scale solar PV inverters and combiner boxes.
Daily external inspection SOP for oil-immersed distribution and power transformers covering MOG oil level, OTI/WTI temperatures, and silica gel breather.
Daily perimeter, switchyard, and control-room safety walkthrough for industrial and utility electrical substations.